Issaquah Station Parking Garage
Post Tensioning Solutions was hired by Sound Transit to completely replace the entire existing vehicle barrier cable system. This covered 36,146 linear feet of galvanized cable barrier and associated anchors and wedges.
The deteriorating stressing pockets were chipped out and all new cable was installed. New anchors and wedges were placed and back seated to bring the system back up to code. Every cable was stress tested to ensure it was within engineers required limits.
Service Type: Vehicle barrier cable system repair
Location: Issaquah, WA
Date Completed: 07/2020