Project Overview

Denny 1120

For this project, our team was brought in to repair multiple post-tensioned tendons that were severed during construction due to interference from wall anchor installations. We located and exposed the damaged areas, replaced the compromised mono-strands, and re-anchored the system to restore full structural capacity. The work was completed with precision to prevent further damage and ensure ongoing safety in this high-rise development.

What's Included in Project

  • Located and exposed damaged tendons
  • Repaired tendon breaks caused by wall anchor interference
  • Restored full structural integrity of the PT slab
  • Prevented further damage during future construction
  • Minimized disruption to active site work

Sectors

Mixed-Use High-Rise

Owner

Confidential

Scope

Post-Tensioning Tendon Repair

Completion Date

11/2021

Denny 1120 Image 1
Denny 1120 Image 2
Denny 1120 Image 3
Denny 1120 Image 4
Denny 1120 Image 5
Denny 1120 Image 6
Heading Icon
Company Porjects

Related Projects

Advanta Parking Structure

Advanta Parking Structure

Barrier Cable System + PT Repairs – Restored grease-exposed monostrand tendons and fully repaired the five-story barrier cable system.

Esterra Park Parking Garage

Esterra Park Parking Garage

Barrier Cable System – Supplied, installed, and stressed 14,208 linear feet of vehicle barrier cable along with 616 barrel anchors.

Reliable Solutions. Real Expertise.

Whether you need barrier cable installation, post-tension repairs, or concrete scanning — we bring clarity, safety, and precision to every project. Backed by decades of certified experience, we make it easier to protect your structure and stay on schedule.

Book a job walk
image