Project Overview

Esterra Park Parking Garage

For this project, we supplied, installed, and stressed 14,208 linear feet of vehicle barrier cable along with 616 barrel anchors. The internal/embedded system was chosen for its adaptability to varying as-built conditions and its aesthetic appeal, ensuring long-term durability and safety.

Details

  • Installing an internal/embedded barrier cable system across a large, variable as-built environment.
  • We supplied, installed, and stressed 14,208 linear feet of barrier cable with 616 barrel anchors, selecting a system that adapts to different conditions.
  • The system provided durable protection with an attractive, integrated look.
  • Teamwork and collabration
  • This project highlights our ability to design and execute large-scale barrier systems in-house, showcasing both technical and aesthetic excellence.

Barrier Cable

Restored Integrity

Supply/Install

Custom Fabrications & Patented Systems

Square Feet

Phase 1: 147,000 - Phase 2: 147,000

Project Date

03-2021

Esterra Park Barrier Cable System
Internal Barrier Cable Install
Vehicle Barrier System at Esterra
Vehicle Barrier System at Esterra
Vehicle Barrier System at Esterra
Vehicle Barrier System at Esterra
Vehicle Barrier System at Esterra
Vehicle Barrier System at Esterra
Heading Icon
Company Porjects

Related Projects

Denny 1120

Denny 1120

Repaired multiple severed PT tendons caused by wall anchor penetrations, restoring system integrity.

Ballard Yards

Ballard Yards

Post-Tension Repair – Relocated 30 tendons to accommodate new in-floor grease trap.

Reliable Solutions. Real Expertise.

Whether you need barrier cable installation, post-tension repairs, or concrete scanning — we bring clarity, safety, and precision to every project. Backed by decades of certified experience, we make it easier to protect your structure and stay on schedule.

Book a job walk
image