Barrier Cable System – Supplied, installed, and stressed 14,208 linear feet of vehicle barrier cable along with 616 barrel anchors.
Comprehensive post-tensioning retrofits across Microsoft campus buildings - including de-tensioning and re-anchoring over 1,200 tendons for atrium openings and complete structural upgrades.
Post-Tension Repair – Relocated 30 tendons to accommodate new in-floor grease trap.
Barrier Cable System – Installed and stressed 98,000 linear feet of vehicle barrier cable and 5,250 anchors.
Barrier Cable System + PT Repairs – Restored grease-exposed monostrand tendons and fully repaired the five-story barrier cable system.
Post-Tension Modification – De-stressed and re-anchored 20 live tendons for new skybridge installation.
Post-Tension Repair – De-stressed and re-anchored epoxy-coated tendons with custom brackets.
Performed two major slab retrofits, including stairwell openings, skylight installation, and elevator expansion by de-tensioning and relocating tendons.
Installed an adaptable barrier cable system with adjustable anchors for a busy Sound Transit light rail station.
Supplied, installed, and stressed over 8,000 LF of external vehicle barrier cable with mounted posts.
Repaired multiple severed PT tendons caused by wall anchor penetrations, restoring system integrity.
Supplied and installed our patented Fortis Pile Shoring system to support a parking garage in a confined urban area.